Unilever

A new link building between production and adjacent service buildings was required for Unilever's site in Leeds.

Following previous successful projects with Unilever, in 2010 we were asked to develop this scheme for their site in Leeds, one of the largest manufacturing facilities for aerosol deodorants. The design brief was to provide a new link building between production and adjacent service buildings, and the scope included architectural remodelling of the existing buildings and enhancement of low grade external spaces.

Project Gallery

Project Details

Accommodation:

70 person breakout area plus WC/Changing facilities

Scope of works:

Architectural remodelling to create new link building.

Size:

5,500ft²

Location:

Leeds

Project Timescale:

18 months

The new space provided a modern and contemporary breakout space and changing facilities for production staff. With strong emphasis on Unilever heritage, the products and the people, the successful scheme was completed in 2011.